Saras refinery Thermal Drying System TDS




Year: 2019 | Location: Sarroch | Customer: Saras


May 2019, start-up of the Thermal Drying System, TDS, at Ecotec plant inside Saras refinery, Sarroch. The TDS plant has a capacity of 1,200 kg/h and integrates the existing preliminary centrifugation section of the refinery's biological sludge. It has replaced the old inertization section, drastically reducing the production of waste to be disposed of.

PLANTS MADE BY ECOTEC

See all references

en_GB